ADC Vision & Mission  |  ADC Management Team  |  Port Community Projects

4. Oil Terminal

• Developer : Aqaba Development Corporation (ADC) contracted BETA.
• Estimated Project Value : USD 28 million.
• Time frame : 2013 –2014.
• Location : At the existing Oil Terminal.
• Objective : The project has been established to maximize the Aqaba Oil Terminal handling capacity for crude oil and refined products. In addition it will comprise upgrading of the oil Jetty and berth facilities to allow safe berthing and de- berthing operations on a 24/7 basis for the full range of tanker sizes for unloading of crude oil, refined product, LPG and Miscellaneous chemical liquids. The associated transfer pumps and pipelines will be inspected and upgraded to enable the terminal to handle approximately 14 million tons annually of crude oil, refined products and Miscellaneous chemical Liquids. Jetty Condition comprehensive Survey and Maintenance will be conducted by the contractor as a preparatory work for the rehabilitation activities of the Aqaba Oil Terminal.
• Terminal will consist of:
1) Rehabilitation of the Terminal Piping System
2) Provide and Install and test a new piping system.
3) Provide, Install and test of eleven Booster Pumps (five crude Oil pumps, 3 petroleum refined products pumps, 3 LPG pumps.
4) Rehabilitation of existing loading arms, provide, Install and test a new set of loading arms.
5) Improving safety and environment status in the Jetty also installing new navigation light.


Print This Page Send To Friend